/[PAMELA software]/gpamela/history/v_100.txt
ViewVC logotype

Diff of /gpamela/history/v_100.txt

Parent Directory Parent Directory | Revision Log Revision Log | View Patch Patch

revision 3.9 by cafagna, Wed Dec 14 03:34:40 2005 UTC revision 3.13 by pamela, Mon Jun 5 13:56:17 2006 UTC
# Line 1  Line 1 
1  #  #
2  # $Id: v_100.txt,v 3.8 2005/12/14 03:16:08 cafagna Exp $  # $Id: v_100.txt,v 3.12 2006/05/18 10:52:32 pam-ba Exp $
3  #  #
4  # $Log: v_100.txt,v $  # $Log: v_100.txt,v $
5    # Revision 3.12  2006/05/18 10:52:32  pam-ba
6    # TOF geometry completed and a new material, the polystyrene (density 35 g/l), added
7    #
8    # Revision 3.11  2006/05/11 23:53:15  cafagna
9    # More bugs fixed in the CALO ntple structure filling
10    #
11    # Revision 3.10  2006/04/10 11:07:43  cafagna
12    # GEN data card updated, ZDGEN added
13    #
14    # Revision 3.9  2005/12/14 03:34:40  cafagna
15    # An update of the history and inform readme files.
16    #
17  # Revision 3.8  2005/12/14 03:16:08  cafagna  # Revision 3.8  2005/12/14 03:16:08  cafagna
18  # Neutron detector added. Geometry and GPCALOR package  # Neutron detector added. Geometry and GPCALOR package
19  #  #
# Line 40  Line 52 
52  #CMZ :  1.00/01 28/11/95  18.51.23  by  Francesco Cafagna  #CMZ :  1.00/01 28/11/95  18.51.23  by  Francesco Cafagna
53  #-- Author :    Francesco Cafagna   28/11/95  #-- Author :    Francesco Cafagna   28/11/95
54    
55    May 2006, Bari & Tor Vergata
56    
57    GIGANTIC RESONANCE FOR NEUTRON DETECTOR ADDED
58    
59       Routines to simulate the gigantic resonance of gammas in Tungsten
60       have been added.  The GPGIG routine is called in GUSTEP if a gamma
61       enter the calorimeter absorber.  This is the steering routine to
62       simulate the production of neutrons from gigantic resonance.  It
63       does checks on STEP lenght. If the range is smaller than the other
64       selected for that step, it does generate the neutron and stops the
65       gamma. Please note that the neutron has now a new particle
66       number. This is to tag the gigantic resonance neutrons.
67    
68    
69    May 2006, Bari & Florence
70    
71    CAL HIT STRUCTURE BUGS FIXED
72    
73       The maximum number of hit is now different for the two hit
74       structures: CALST and CALI. Vectors inizialization and HBOOK
75       ntple booking have been updated. The GPDCAL routine has been fixed
76       so to handle the case in wich hits stored are more than the maximum
77       number of hit.
78       In this case in the ntple up to the maximum number of hits will be stored.
79    
80    April 2006, Bari
81    
82    TOF GEOMETRY AND POSITIONS UPDATED AND NEW MIXTURES ADDED
83    
84       The TOF geometry has been modified. The following boxes have been
85       added: POL1, POL2 and POLY made of polystyrene, S11M, S12M, S21M,
86       S22M, S31M and S32M made of mylar, S1A, S2A and S3 made of air and
87       S1 and S2 made of aluminum. Each scintillator paddle has been put
88       in his mylar box and the other materials: air, polystyrene, and
89       aluminum have been added at their nominal positions.  According to
90       Naples people the araldite glue has been simulated has an air
91       gap. For this work two new materials: the Mylar (MYLAR) and the
92       polystyrene (POLYSTYRENE) with a density of 35 g/l have been
93       defined as a mixture.  The positions of the three bottom
94       scintillator planes that contain respectively the S12X, S22Y and
95       S32X paddles have been regulated according on their official
96       positions in PAMELA.
97    
98    Mar 2006, Bari
99    
100    GEN DATA CARD UPDATED
101    
102       To enable generation on a surface perpendicular to the XY plane,
103       GEN gata card has been updated addingh a new parameter: ZDGEN. This is
104       the dimension, along Z axis , of the generation surface. The Z
105       position will be randomply chosen according to: Z= ZDGEN*RNDM_NUMBER +
106       ZGEN, i.e. Z= GEN(6)*RNDM_NOMBER + GEN(3).
107    
108  Nov 2005, Bari  Nov 2005, Bari
109    
110  GUHADR AND GUPHAD UPDATED  GUHADR AND GUPHAD UPDATED
# Line 92  GCALOR PACKAGE ADDED. NEW DIRs: GPCALOR, Line 157  GCALOR PACKAGE ADDED. NEW DIRs: GPCALOR,
157        
158    
159  The GCALOR package  The GCALOR package
160    
161    June 2005, Bari
162    
163    TOF SCINTILLATOR PADDLES UPDATED
164    
165       The dimensions and the number of the scintillator paddles for each
166       TOF planes have been updated.
167    
168  May 2005, Bari  May 2005, Bari
169    
170  Some updates on the latest modification done in the past year.  Some updates on the latest modification done in the past year.

Legend:
Removed from v.3.9  
changed lines
  Added in v.3.13

  ViewVC Help
Powered by ViewVC 1.1.23